运营管理要求文件资料翻译中英文对照

2.3.5中转站管理Transfer Station Management
XXXXXX中转站的管理分为两个阶段:中转站建设时期的管理与中转站运营时期管理。为了保障项目运输的需要,中转站管理的重点是中转站运
营的管理。
Management of XXXXXX transfer station consists of 2 stages: management during the construction of transfer station and
management during the operation of transfer station. In order to meet the requirement of project transport, the main task is management during the operation of transfer station.
为保证中转站建设及运营顺利进行,在现场设置一套精简高效的管理机构,制定合理的建设方案,减少各项费用开支,集中办公,简化管理手
续,加快施工进度。同时控制建设质量,保证中转站各项设施符合业主。
In order to ensure the smooth progress of transfer station construction and operation, an efficient management organization
shall be established on site. Proper building scheme shall be prepared to minimize cost. Office shall be arranged in one place to simplify formalities and improve construction progress. Construction quality shall be controlled to ensure each facility of transfer station complying with Owner.
成立中转站指挥部,根据机能下设管理小组,统一指挥,分工明确,紧密联系,有效沟通,确保建设施工所需资源和项目运作中各项任务得到
有效落实,同时指挥部对各小组的日常工作进行监督、检查,参与业主组织的重要工程协调会、安全月会、质量月会等会议,以及对中转站所有人员进行考核等,并接受业主、监理方的监督。
Transfer headquarters shall be established with management teams as subordinates. Task division shall be clear. Communication
shall be close and efficient in order to ensure all resources and tasks required by construction are in place. The headquarters will check and supervise the routine works of each team, and attend important coordination meeting, monthly safety meeting, monthly quality meeting organized by owner, as well as assess all staff at transfer station. The headquarters is subject to supervision of owner and supervisor.
中转站运营的管理采取岗位责任制,把各环节落实到岗位责任人,进行专项管理。在物资入库、储存、出库等环节实施规范的登记制度,实施
信息录入制度,以便利业主决策。
The management of transfer station operation shall adopt system of post duty, in which the duty of each step will be
specified to a certain personnel. Steps as goods input, stock, output shall be registered in order to facilitate decision making of owner.
按照业主发运计划,及时的协调分包商,按计划下达运输指令。
To timely coordinate subcontractors and issue transport orderaccording to owner’s transport plan.
成立专门的清关小组。加强对AAAAAA海关政策的学习与研究,积极与AAAAAAXXXXXX海关保持沟通与联系,掌握政策变动的信息,随时做好清关
相关工作的准备。
Special customs clearance team shall be established. Pay attention to the study of AAAAAA customs policy, actively keep close
contact with AAAAAA XXXXXX customs to master any change of policy and make preparation for customs clearance all the time.
2.4项目各阶段的工作要求Working Requirement of the Project in Different Stages
2.4.1中转站建设要求Transfer Station Constructing Requirement
根据XXXXXX当地的自然条件,租赁土地情况结合招标方对中转站的要求进行合理的设计规划,组织建设:生活区,办公区,平整的作业场地,
仓库,停车场,司乘人员车辆服务区。
Take reasonable planning to organize the construction in accordance with the local natural condition in XXXXXX, leasing land
condition in connection with the requirement of transfer stations from the bid inviter, including living area, office area, smooth working field, warehouse, parking lot, service area for vehicle drivers and passengers. The construction of XXXXXX transfer station shall meet the requirement for material and equipment transfer and storage from the bid inviter. The capacity for storage and transfer under construction shall exceed the transferring capacity planned by the bid inviter.
XXXXXX中转站的建设要求达到能够满足招标方物资与设备转运及仓储的要求。建设的库存、中转容量要高于招标方的中转量的计划。
中转站管材堆码以“防止管材破损、便于装卸、防止滚垛”为原则,具体要求如下:
The transfer station pipe stack shall adhere to principle of “preventing pipe damage, facilitating loading and discharge and
preventing skid”, including the requirements as follows:
(1)中转站应保证平整,坚固、防止积水。
(2)管材实行分区堆放,做到按管径、规格码垛,不同管径的钢管要分开码垛,严禁混码。中转站各码垛前必须要设有清晰明确的指示、警示
和警告标志。
(3)中转站内运输车辆车速不超过30Km/h,特种车辆车速不超过15Km/h,中转站内部必须设置明确的车辆限速表示牌。
(4)中转站必须设置安全通行通道,安全通行通道应保证车辆保证顺进顺出,各垛位间距安全距离不小于16m,保证吊车、倒运车辆并排安全
通行,便于管材装卸、倒运。
(1) The transfer station shall be kept flat and firm, preventing any water accumulation.
(2) The pipe materials shall be piled by areas, realizing pileup by pipe diameter and specification. Steel pipes with
different diameters shall be piled independently without any mixtures. Clear direction, alarm and warn marks shall be arranged in front of all stacks within the transfer station.
(3) The velocity of transporting vehicles in the transfer station shall not exceed 30km/h. The velocity of special vehicles
shall not exceed 15km/h. Apparent indicating plate for velocity limit shall be arranged within the transfer station.
(4) Safety transit passage shall be arranged for the transfer station, which shall ensure smooth access of vehicles. The
spacing between piles shall not be smaller than 16m, thus ensuring parallel safe passage of the hoist and transfer vehicles and facilitating easy pipe loading, discharge and transfer.
(5)堆垛设置要求:
(5) Stacking arrangement requirement
垛高不超过3m,φ1016mm堆放不超过三层, φ813mm堆放不超过四层。
The stack height shall not exceed 3m. φ1016mm pipes shall not be piled over three rows, while φ813mm pipes shall not be
piled over 4 rows.
垛底必须设置垛基。每个垛基底宽不小于0.8m,垛基顶宽不小于0.4m,两垛基相距6±0.6m,高度不小于0.3m,每两个形成一个钢管垛位。为
防止管材损坏和钢管滚动,垛基上部应加垫草垫或编织袋。
Pile base shall be arranged at the bottom, the bottom width of which shall not be less than 0.8m with the top width not less
than 0.4m. The distance between two pile bases shall be 6±0.5m in length and not less than 0.3m in height. One steel pipe pile is made for each two pile bases. In order to prevent pipe damage and pipe skid, straw mattress or woven bag shall be added on top of the pile bases.
为防止滚垛,堆垛端部必须设置挡垛,可使用砂袋掩堵,也可使用埋地档头。砂袋掩堵应在每个垛基头部用沙袋码放一个高1m、长1m的挡垛;
埋地档头应满足强度要求,不少于2根,埋深不小于4m,基础用混凝土浇灌,地面高度不低于2m。
In order to prevent pile skid, pile barrier shall be arranged on tope of piles, which can be realized with sand bags
obstruction or ground-buried barrier. In case of sand bag obstruction, the pile barrier with 1m in height and 1m in length shall be arranged on top of each pile base. The ground-buried barrier shall meet the strength requirement, not being less than two and the burying depth shall not be smaller than 4m. With concrete depositing in the base, the height on ground shall not be less than 2m.
堆垛端部底层最外边两根钢管应使用管卡固定牢固,防止滚动。
Pipe clip shall be applied for the fixation for the exterior two pipes at the bottom of pile top, thus preventing any skids.
管垛两端应设置排水沟,防止场地积水,排水沟深度约0.3米,宽度0.6米。
At both ends of pipe pile, drainage ditch of 0.3m deep and 0.6m wide shall be arranged in order to prevent water ponding.
中转站内部若设有办公区域或休息间,应与堆垛边缘距离不小于10m。
In case of arrangement of office area or rest room within the transfer station, the distance between them with the pile verge
shall not be less than 10m.
码垛前或大雨、暴雨后应对垛基进行检查加固。
Before piling or after heavy rain and rainstorm, fixation consolidation shall be examined for pile bases.
2.4.2中转站运营管理要求Requirement for Operation Management of Transfer Station
Bid Inviter 招标方
Head Office 总公司
Project Manager 项目经理
Material Management 物资管理  
Quality Examination and Acceptance
质量验收
Coordinating Staff 协调人员
Site Operation 现场操作
Safety Guard 安全保卫
Documentation and Customs Declaration
制单报关
Logistics Guarantee 后勤保障
Financial Management 财务管理
Forklift Worker 叉车工
Hoisting Worker 起吊工
Crane Operator起吊工
Stevedore 装卸工
XXXXXX中转站建成后,及时配置设备机力、生活物资与办公用品,入驻工作人员,保证中转站尽快投入使用,保证项目顺利执行。并对生产操
作各岗位建立标准流程和规范,对相关人员进行岗位培训,对防火、防盗、现场安全作业等一系列的规范组织学习,落实各个岗位的责任负责人,同时也明确工作人员的责任。
After the build-up of XXXXXX transfer station, arrange equipment, power, living materials and office supplies for working
staff. Put transfer station into operation as early as possible. Standard flow and codes shall be established for each production post. Take post training on relevant staffs, organizing studies for a series of norms, including fire prevention, theft protection, site safety and the like. Identify the person of liability in all posts and the duties of working staffs.
XXXXXX物资中转站投入使用后,做到24小时值班,各项工作顺利开展,快速有效地装卸、转运货物,实现中转、控制、枢纽作用。
After XXXXXX transfer station is put into use, 24 hours per day shall be arranged for duty, thus realizing rapid and
effective discharge, loading and goods transfer. In this way, it realizes the effect of transfer, control and hub.

华译网上海翻译公司曾经翻译过大量有关运营管理要求资料文件,Beijing Chinese Subtitling Translation Service Agency has translated many technical documents about Requirement for Operation Management of Transfer Station.
XXXXXX中转站完成物资的中转任务后,对其进行拆除和地貌恢复。在征得业主同意的前提下,根据实际情况确定地貌恢复方案,对残余建筑垃
圾进行妥善处理,避免对当地环境造成影响。
After the completion of material transference, XXXXXX transfer shall be dismantled. With the precondition of acquiring the
approval from the Owner, the natural feature a d terrene feature shall be restored. Take care of the wastes dismantled effectively, thus preventing any pollution to local environment.

上一页   下一页
翻译语种 更多>>
英语翻译 德语翻译 法语翻译
俄语翻译 日语翻译 韩语翻译
西班牙语 葡萄牙语 荷兰语翻译
乌克兰语 意大利语 波兰语翻译
丹麦语翻译 希腊语翻译 泰语翻译
瑞典语翻译 越南语翻译 阿拉伯语
专业范围 更多>>
· 安全环保 · 能源电力 · 银行保险
· 法律翻译 · 天文地理 · 钢铁冶金
· 航空航天 · 道路桥梁 · 地质采矿
· 建筑工程 · 金融财会 · 经济管理
· 交通运输 · 仪器仪表 · 医疗器械
· 医药卫生 · 石油化工 · 机械电子
译者 更多>>
· 法语机电专业翻译 张先生
· 法语财经专业译者--王先生
· 法语金融保险专业译者 --...
· 法语翻译石油化工专业译者 ...
· 德语电子专业翻译 黄女士
· 德语法律专业翻译 李先生
· 德语医药翻译 赵女士
· 法语机电专业翻译 张先生
· 法语财经专业译者--王先生
· 德语财经金融保险专业译者 ...
· 德语石油化工专业译者 --...
· 法语金融保险专业译者 --...
· 法语翻译石油化工专业译者 ...
业绩 更多>>
· 德语翻译项目部分成功案例介绍
· 法语翻译项目部分成功案例介绍
· 葡萄牙语翻译项目案例介绍
· 意大利语翻译部分项目列表
· 西班牙语翻译部分项目介绍
· 俄语翻译部分项目介绍
· 日语翻译部分项目
· 小语种部分翻译项目介绍
上海漕溪北路38号20G 电话:021-31200158 shkehu@263.net,QQ:390645976
北京海淀区太阳园4号楼1507室 电话:010-82115891 82115892 bjhyw@263.net QQ:800022641
太原市万柏林区迎泽西大街奥林匹克花园7D202 电话:15034183909 Email:tykehu@163.com
京ICP备05038718号-15