加固及安全保障措施文件资料中英文对照翻译

3.1.2.4 车辆绑扎加固要求
3.1.2.4 Binding and reinforcement requirements for vehicles
加固原则
Reinforcement principles
针对XXXXX管线项目施工设备陆路运输途经路况、桥梁等特点,合理配载、加固是非常重要的,在设备装运过程中我司将坚持以下货物装载原则:
It is very important for reasonable cargo stowage and reinforcement according to the road and bridge conditions that equipments land transports of AAAAAAA pipeline project pass through. Our company will adhere to the following principles of cargo loading in the process of equipments shipment:
(1)大不压小、重不压轻、合理配载,充分使用运载工具的核定载重量和容积。
(1) No bigger boxes on the top of the smaller and the lighter without the pressure of the heavier, reasonable cargo stowage, full use of rating deadweight and volume of vehicles.
(2)货物均衡、稳固,合理地分布在运输工具车底板上。不超载、偏载、集重、偏重。
(2) Goods balance and fixedness, reasonably distributed on the floor of the trunks. No overloading, partial loading, concentrated weight or laterality.
(3)充分利用运输工具容积,巧装满载,有条件时货物采取大小套装、轻重搭配的办法。在运输过程中,货物不发生移动、滚动、倾覆、倒塌、坠落等现象。
(3) Full use transportation volume, skillful and full load, combination of the bigger and the smaller and combination of the lighter and the heavier adopted when condition permitting. During transport, no goods movement, roll, overturning, collapse or falling and so on.
(4)货物的长度、宽度、高度、重量、体积,不得超过公路运输要求,货物重量不得超过运输工具允许的载重量。
(4) The length, width, height, weight or volume of cargoes shall not exceed the requirements of road transportation, and the weight of cargoes shall not exceed the permitted deadweight of transportation.
(5)大型设备要根据货物的尺寸及重量合理配载,根据成本及操作方便,选择适当的运输车辆。
(5) Large-scale goods should be reasonable loaded based on the dimension and weight of the goods and appropriate transport vehicles are adopted according to cost and convenience of operation.
注意事项
Notes
为避免在装卸作业环节对设备的外观损坏,凡是带轮可自行驾驶的车辆均采用通过自爬方式装车,设备卸车时也采用自行驾驶卸车,对于普通设备而言,在吊装作业中,采用平衡梁装载,同时在起吊钢丝绳与设备接触部分采用橡胶垫垫衬,以利于保护设备外表漆面,避免漆面被刮伤。
To avoid damage to the appearance of the equipments when loading and unloading, self-climbing loading is adopted for all wheeled vehicles, self-drive unloading is also allowed for equipments unloading. For the common equipments, the balance beam loading and unloading is adopted for hositing operation the and at the same time rubber mat liner is adopted for the interface of lifting steel wire and equipments to protect the paint appearance of equipments to avoid it being scratched.
对于大型设备高度超出规定高度时,能够拆解的部分建议进行拆解,对于不能拆解的设备,采用特种平板车安排运输。
For the large-scaled equipments which exceed the required height, disassembling is suggested for the disassembled parts, while special flatbed trunks are adopted for the other parts.
加固及安全保障措施
Reinforcement and security measures
使用平板车装载长度或宽度超出车底板的货物,要用镀锌铁线、钢丝绳、铁链或导链与车体捆绑牢固。钢丝绳、铁链或导链和设备接触的部分必须使用橡胶垫进行防护。对于带轮设备捆扎加固时,必须使用角木衬垫车轮,防止车轮滚动,角木应与车板的地板固定。集重货物,应在平板车地板铺设垫木和草支垫、稻草绳把,装载量可以达到车辆容许载重量。对于大型设备、贵重物品的运输,要使用押运人员,以随时检查设备是否有窜动现象。
If the length or width of cargoes is beyond the floor of flatbed trucks, the cargoes should be firmly tied with the body with galvanized iron wire, steel wire rope, iron chain or leading chain. The rubber pad must be used for the contact part of the steel wire rope, iron chain or lead chain and equipments for protection. For the binding and reinforcement of devices with pulley, wheel with angle wood liner must be used to prevent the wheels rolling, and angle wood should be fixed with the floor of flatbed trucks. For the concentrated weight cargoes, chock block, grass mats or straw ropes should spread out on the floor of the flatbed truck and the deadweight is allowed to the maximum permissible value. For large equipments or valuable goods, cargo attendants are adopted to check whether the shifting of equipments at any time.
3.1.2 运输进度计划
3.1.2 Transport schedule
根据招标文件总体进度安排细化。至少包括港口接收、XXXXX港口直接转运、XXXXX中转站倒运、内河运输、公路运输、临时码头卸货的计划。
Transport schedule is detailed according to the general progress of the tender documents. The plans include at least the receive of ports, direct transshipments of XXXX port, reversed transport of XXXX transfer station, inland water transport, road transport, temporary port discharge.
根据业主的发货计划与工程的施工进度制定运输计划。充分考虑当地的运力与气候因素对运输的影响,同时考虑中转站的存储能力。XXXXX作为此项目在XXXXX中南部地区物资的集散地、中转地关系着整个工程建设的进度,责任重大,因此在制定运输进度计划中认真分析、充分考虑、整体布局。
Transportation plans are developed according to the delivery plans of owners and projects schedule. The impact of local transport capacity and climate should be taken into full consideration, and at the same time, the storage capacity of transfer stations is also considered. XXXX, as distribution center and transit site of goods of this project in the central and southern AAAAAAA, relates the overall the progress of project construction, which bears great responsibility, so careful analysis, full consideration and overall layout should be given for the development of transportation plans .
由于招标书内未具体列明各阶段具体的到货计划和发运计划,因此按照均衡发运的原则进行测算。
As specific incoming merchandise plans and delivery plans at all stages are not specified in the tender document, and measurement is carried out in accordance with the principles of balanced delivery.
钢管运输到中转站计划表:
Schedule of steal Pipe being transported to the transfer station:
序号
No. 中转站
名称
Name of transfer station Feburary,2011-
October,2011 November,2011-
April,2012 May,2012-
October, 2012. Sum up
KM
1 XXXXX
XXXX 280 370 432 1082
2 皎漂Kyaukpyu 60 60 58 178
3 马圭
FFFFF 120 180 202 502
4 XXXXManderlay 100 130 172 402
备注:运输量(原油管道用钢管和天然气管道用钢管)单位:公里 KM
其中XXXXX港的运量计算公式为:XXXXX=皎漂+马圭+XXXX 的运输量。
Note: traffic volume (crude oil pipeline steel pipe and natural gas pipelines steel pipe) Unit: KM, and traffic volume for XXXX port is calculated as: traffic volume of XXXX = that of kyaukpyu , FFFFF and GGGGG.
第一阶段:2011.2-2011.10为期9个月。XXXXX中转站每月计划发运28 KM ;
The first phase: from February, 2011 to October, 2011, period of 9 months, estimated 28 KM each month for XXXX transfer station.
第二阶段:2011.11-2012.4 为期6个月。XXXXX中转站每月计划发运62 KM;
The second phase: from November, 2011 to April, 2012, period of 6 months, estimated 62 KM each month for XXXX transfer station.
第三阶段:2012.5-2012.10 为期6个月。XXXXX中转站每月计划发运72 KM 。
The third phase: From May, 2012 to October, 2012, period of 6 months, estimated 72 KM each month for XXXX transfer station.

华译网上海译公司曾经翻译过大量有关加固及安全保障措施资料文件,Beijing Chinese Subtitling Translation Service Agency has translated many technical documents about Reinforcement and security measures.
当月运输计划内容具体结合规格型号、长度、重量、目的地中转站名称,根据工程需求配发运输车(船)辆。根据规格型号、管号、长度、重量、根数、出发地进行合理配载。
The transport plans of each month should be combined with the specifications, the length, weight, name of transfer station of destination. Vehicles (boats) should be dispatched according to project demands. Reasonable cargo stowage is carried out according to specifications, the pipe number, length, weight, the number of pipes, starting places.
3.1.3 运输成本控制计划
3.1.3 Control plan of transportation cost
结合其他管线项目运输经验,分析此项目的运输特点,运输成本的控制主要体现在:在货物到港后,及时清关,避免船只的滞留;港口接货后减少倒运次数,对运输工具的改装、加固方式进行评价,对不符合运输规范的及时整改,并定期检查运输工具性能状况,尽量避免运输途中出现事故、故障,导致的额外费用产生;合理存放,减少场内倒运次数。
In combination with transport experience of other pipeline projects and analysis of the transport characteristics of this project, control plan of transportation cost are mainly embodied in the following:, timely clearance after the arrival of the goods to avoid the vessel retention; the reduction of reversed transport times after taking the delivery, evaluation of modification and reinforcement of vehicles, timely rectification of vehicles that do not meet the transport standards, and regular inspection of performances of vehicles, trying to avoid the additional costs caused by the accident and failure during transportation, reasonable storage, reducing reversed transport times in the field .
3.2 物资中转站建设实施要点
3.2 The main points of construction and implementation of material transfer station

上一页   下一页
翻译语种 更多>>
英语翻译 德语翻译 法语翻译
俄语翻译 日语翻译 韩语翻译
西班牙语 葡萄牙语 荷兰语翻译
乌克兰语 意大利语 波兰语翻译
丹麦语翻译 希腊语翻译 泰语翻译
瑞典语翻译 越南语翻译 阿拉伯语
专业范围 更多>>
· 安全环保 · 能源电力 · 银行保险
· 法律翻译 · 天文地理 · 钢铁冶金
· 航空航天 · 道路桥梁 · 地质采矿
· 建筑工程 · 金融财会 · 经济管理
· 交通运输 · 仪器仪表 · 医疗器械
· 医药卫生 · 石油化工 · 机械电子
译者 更多>>
· 法语机电专业翻译 张先生
· 法语财经专业译者--王先生
· 法语金融保险专业译者 --...
· 法语翻译石油化工专业译者 ...
· 德语电子专业翻译 黄女士
· 德语法律专业翻译 李先生
· 德语医药翻译 赵女士
· 法语机电专业翻译 张先生
· 法语财经专业译者--王先生
· 德语财经金融保险专业译者 ...
· 德语石油化工专业译者 --...
· 法语金融保险专业译者 --...
· 法语翻译石油化工专业译者 ...
业绩 更多>>
· 德语翻译项目部分成功案例介绍
· 法语翻译项目部分成功案例介绍
· 葡萄牙语翻译项目案例介绍
· 意大利语翻译部分项目列表
· 西班牙语翻译部分项目介绍
· 俄语翻译部分项目介绍
· 日语翻译部分项目
· 小语种部分翻译项目介绍
上海漕溪北路38号20G 电话:021-31200158 shkehu@263.net,QQ:390645976
北京海淀区太阳园4号楼1507室 电话:010-82115891 82115892 bjhyw@263.net QQ:800022641
太原市万柏林区迎泽西大街奥林匹克花园7D202 电话:15034183909 Email:tykehu@163.com
京ICP备05038718号-15