南非土木工程施工标准 LF:供水用ERF连接 英文原文节选 20100079 1-31 |
AC pipes. Except where plug-in type (expanding) ferrules are scheduled, and except where the water main is of Class 18 (CID) or Class C (COD) or better and has a wall thick enough for direct tapping, saddles shall be used for service connections to AC pipes. tappings in AC pipes shall not exceed 20 mm for pipes of nominal diameter 100 mm and 150 mm, and shall not exceed 25 nun for pipes of nominal diameter greater than 150 nun. A service connection to an AC pipeline may be made a) at a joint by using 1) a long collar detachable joint, or 2) a CI detachable coupling that is longer than the standard sleeve and incorporates a platform with a tapped hole to which a service connection can be attached, or b) on a pipe section at a position not less than 300 mm from the end of the pipe by one of the following methods: 1) The pipe shall be drilled at the take-off point to a diameter greater than that of the threaded portion of the ferrule. A suitable saddle complete with rubber washer having a hole that has been clearly punched to the size of the ferrule beforehand, shall then be accurately centred over the hole, and bolted round the pipe, the boss being drilled and tapped to the size required for the ferrule. ferrule of the appropriate size shall then be installed. 2) A saddle complete with rubber washer shall be bolted round the pipe at the take-off point. for the connection shall then be drilled and tapped through the saddle, washer, and pipe and a ferrule of the appropriate size installed. 3) Where plug-in type ferrules for AC pipes are scheduled or specified in the project specification, the pipe shall be drilled to the correct size, and a ferrule of the type and dimensions appropriate to the wall thickness of the pipe shall then be installed in accordance with the ferrule manufacturer's instructions. In each method given in (b) (11, (21, and (3) above the ferrule shall be so installed that, when the connection is tested in terms of 7.1, there is no sign of visible leakage. CI pipes. take-off point and then fitting a ferrule of the required size in the manner specified in 5.2.3.2 b(2). Steel pipes. Where a service connection is required to be taken off a steel pipe, the Contractor shall observe the special procedures specified in the project specification to ensure that any pipe lining or coating is not damaged by the connection. uPVC pipes. On uPVC pipes service connections shall be made using special saddles in strict accordance with the method recommended by the pipe manufacturer. Pipes shall be cut in such a way that each cut end is smooth and clean. Pipes of Different Materials. Pipes and fittings of different materials shall be jointed only with special adaptors recommended by the pipe manufacturer(s) and approved by the Engineer. BRICKWORK. Except where a manhole is constructed to the relevant requirements of Subclause 5.8 of SARS 1200 L for a service connection to a major consumer or where surrounds of other materials are required in terms of the contract, brickwork shall be so placed around each stop tap and meter as shown diagrammatically on the drawings that a) there is enough room for an operator to operate the stop tap easily; b) the cover, if any, on the meter can be opened or removed to enable the meter to be read; c) the surrounding soil does not seep into the space required for operating the stop tap and reading the meter. Mortar shall be used between courses of bricks, and on the top to hold the frame of the surface box or cover in place (see 5.6). CONNECTING POINTS Markings and Marker Posts. If so scheduled, markings or marker posts shall be placed to mark the position of the end of each future pipe connection in the manner specified in the project specification. Recording of Locations. shall record the following data in respect of each connection and, at the time of recording, shall make the data available to the Engineer to enable him to check their accuracy: a) The name of the street; b) the number of the plot or erf; c) the location measurements of the stop tap in relation to the nearest erf peg(s); d) the position of the connection on the supply main relative to lateral erf boundaries and all such other information as the Engineer may require; e) the size of the connection. On completion of the contract, or from time to time, as directed, the records shall be handed to the Engineer. The nominal diameter of ferrules used for direct A The hole On CI pipes a service connection shall be made by drilling and tapping the pipe at the and In addition to placing any markings or marker posts required, the Contractor INSTALLATION OF METERS AND STOP TAPS Meters. Each meter shall be installed in the position shown on the drawings and in such a manner that the meter can be removed easily after unscrewing the couplirigs and slightly springing the pipes apart. Paint or joint compound shall be used so sparingly on threads as not to clog the working parts of the meter or, alternatively, PTFE sealing tape shall be used at couplings. The inlet and outlet of each meter shall be kept securely covered until the meter is installed. Before being installed, each meter shall be blown through carefully in the direction of the arrow on the meter to ensure that it works freely. the correct direction. Stop Taps. direction of flow. INSTALLATION OF SURFACE BOXES. and in such a way as to afford adequate protection for the meter and stop tap. shall be backfilled to the underside of the meter. The meter shall then be set in position with the arrow pointing in Each stop tap shall be installed with the arrow on the body of the tap pointing in the Each surface box shall be set according to the ground slope, clear of, The inside of the box原件下载:
|
|
|
|