上海翻译公司 021-31200158 010-82115891/5892
 
翻译样稿 更多>>
· 南非土木工程施工标准 W部...
· 南非土木工程施工标准 W...
· 南非土木工程施工标准 V部...
· 南非土木工程施工标准 V...
· 南非土木工程施工标准 U部...
· 南非土木工程施工标准 U...
· 南非土木工程施工标准 T部...
· 南非土木工程施工标准 T...
· 南非土木工程施工标准 S部...
· 南非土木工程施工标准 S...
业绩 更多>>
· 德语翻译项目部分成功案例介绍
· 法语翻译项目部分成功案例介绍
· 葡萄牙语翻译项目案例介绍
· 意大利语翻译部分项目列表
· 西班牙语翻译部分项目介绍
地质矿产英译中翻译样稿
当前位置:首页 > 翻译样稿 > 地质矿产英译中翻译样稿

Business Plan By Kilburn Energy Limited._English Source_Sample 20110181 _1_1

Executive Summary C/O  Pt Niaga Abi Zahara Coal Mine       
Business Plan By Kilburn Energy Limited.         
 
             
                          Descriptions                  Facts Of The Matter Remarks By Kilburn Energy
             
Commodity    Coal Mine      Green Field.
Grade      > Cv6,100      Boaring Test Report Attach.
Location  Sumatra (North), Indonesia.  Area Map Shall Be Given Upon  Loi
Total Hectares For Exploration     4,000ha (Allowed 3803ha)    Full Details Available With Us
Boring Done   197 Ha    Boring Test Chart Available
197 Ha Coal Reserves Found Estimated Between 5mil. To 6 Mil       Geological Report Done
Estimated Coal For 4,000 Ha 30,000,000 Mt      
Drilling Holes Done      18 Holes  Full Boring Data Available
Drilling Done By   Pt Ba     
Average Seam Thickness       1.1s/D  11.03 Mtr Report Done
Exploration License Issued N0. Iup/Kp Exp.Done On 2007 Location.1992/30/Dfm/2010
Estimated Ob To Ore Ratio    1:10
Mining Licence Issued   24 April, 2010 Until 2030     Valid For 19 Years
Close Airport To Mine   Sultan Syarif Kassim 11 Pekanbaru      Regular Flights
Distance From Major City To Mine      Abt 40km       Information Available
Distance From Mine To Hotel       Abt40km
Port Stockpile Capacity  To Be Advised To Be Advised
Distance From Mine To Port  Abt 190km    
Port To Use To Export Out    Dumai,Indonesia    To Be Advised
Road Condition Width   8mtr, Thru Villages Toll Rights Signed Between Villages Done
Largest Truck Capacity For Hauling     35 Ton Any One Time    Local Transportation Available
             
Others            Upon Confirmation
             
 
Note.            
The Mine Is Available For Joint Venture
The Equity For The Investor Is Given At 60% And The Mine
Owner Holds Back 40%
Offtake Contract At The Investors Discretion
With A Long Term Contract Pricing/Lower Than The Prevailing Market Price
Investment Required Is Us$ 8 Mil And Us$ 2 Mil For Infra -Structure Work At Site
Coal Raising And Contractors Appointment At The Investors Discretion And Choice.
The Investor Will Able To Operate The Mine The Best Way They Deem
Kilburn Energy Requires An Introduction Fee.
原件下载:
翻译语种 更多>>
英语翻译 德语翻译 法语翻译
俄语翻译 日语翻译 韩语翻译
西班牙语 葡萄牙语 荷兰语翻译
乌克兰语 意大利语 波兰语翻译
丹麦语翻译 希腊语翻译 泰语翻译
瑞典语翻译 越南语翻译 阿拉伯语
专业范围 更多>>
· 安全环保 · 能源电力 · 银行保险
· 法律翻译 · 天文地理 · 钢铁冶金
· 航空航天 · 道路桥梁 · 地质采矿
· 建筑工程 · 金融财会 · 经济管理
· 交通运输 · 仪器仪表 · 医疗器械
· 医药卫生 · 石油化工 · 机械电子
译者 更多>>
· 法语翻译 赵女士 汽车及零...
· 翻译翻译 郝女士 上海航...
· 法语翻译 张女士 石油、...
· 法语翻译 杨先生 酒店、旅...
· 法语翻译 张先生 上海电子...
上海漕溪北路38号20G 电话:021-31200158 shkehu@263.net,QQ:390645976
北京海淀区太阳园4号楼1507室 电话:010-82115891 82115892 bjhyw@263.net QQ:800022641
太原市万柏林区迎泽西大街奥林匹克花园7D202 电话:15034183909 Email:tykehu@163.com
京ICP备05038718号-15